Skip to content
Better Way Quote Builder

DEMO | Fictional company | EXAMPLE DATA

Example pricing rules

Write your rules down once and every estimate uses them. Edits here are drafts until you apply them. Identity, currency, material ids, and package order are fixed in this demo.

Active local rules revision: 0Canonical example data

Current builder job under old rules vs draft rules

$12,871.43 -> $12,871.43 | Change: $0.00

Materials and installation

Cost per square is the supplier allowance before waste. Waste applies to the material row only, never to labor.

Architectural asphalt
Designer asphalt
Standing-seam metal

Removal and disposal

Charged per square for each existing layer when the effective work is tear-off.

Pitch and timing

Pitch and timing surcharges are additive and apply to installation labor only. The lookup uses the first band whose endpoint is at or above the pitch.

Band 1: 4:12 to 6:12

Display only, not logic.

Band 2: 7:12 to 9:12

Display only, not logic.

Band 3: 10:12 to 14:12

The final band always ends at 14:12.

Display only, not logic.

Standard timing stays at 0%.

Subcontractors and extras

Subcontractor allowances never receive the urgency surcharge.

Limited work around an existing skylight.

Margin and minimum

Margin is not markup: selling price = cost / (1 - margin), so 30% margin is a 42.9% markup. The permit allowance passes through at cost with no markup and is excluded from the margin check.

0% to 80%.

At or below the target. Discounts that land under the floor require review.

Pass-through. Same amount in revenue and cost.

Must be greater than the permit allowance. A minimum adjustment lifts small jobs to this total.

Example policies

Mandatory fictional company policies. Scope messages interpolate these thresholds.

1 to 3.

4 to 14.

1 to 200 in half squares.

Takeoff factors (example rules)

Whole-unit factors for the material takeoff draft. They produce quantities only, never prices, and every line of the draft names its factor as an example rule.

Applied after the material waste allowance.

Eave length is approximated as two runs of gutter.

Ridge length comes from the ridge vent length.

Differences from canonical example data

The active rules compared with config/pricing.example.json.

The active rules match the canonical example data.

Active rules JSON (read-only preview)

Integer cents and basis points, with the EXAMPLE DATA label and schema version. Use Import for structured replacements.

{
  "schemaVersion": 1,
  "label": "EXAMPLE DATA. Fictional company. Not real pricing.",
  "company": {
    "name": "Northwoods Example Roofing Co.",
    "city": "Appleton, WI"
  },
  "currency": "USD",
  "materials": {
    "asphalt_architectural": {
      "label": "Architectural asphalt",
      "costPerSquareCents": 14000,
      "laborPerSquareCents": 9000,
      "wasteBps": 1000
    },
    "asphalt_designer": {
      "label": "Designer asphalt",
      "costPerSquareCents": 22000,
      "laborPerSquareCents": 9000,
      "wasteBps": 1000
    },
    "metal_standing_seam": {
      "label": "Standing-seam metal",
      "costPerSquareCents": 45000,
      "laborPerSquareCents": 20000,
      "wasteBps": 1500
    }
  },
  "packageOrder": [
    "asphalt_architectural",
    "asphalt_designer",
    "metal_standing_seam"
  ],
  "tearOffPerSquarePerLayerCents": 4500,
  "disposalPerSquarePerLayerCents": 1500,
  "pitchBands": [
    {
      "maxPitch": 6,
      "label": "Standard labor band",
      "laborSurchargeBps": 0
    },
    {
      "maxPitch": 9,
      "label": "Additional labor",
      "laborSurchargeBps": 1500
    },
    {
      "maxPitch": 14,
      "label": "Steep access",
      "laborSurchargeBps": 3000
    }
  ],
  "subcontractors": {
    "steepSafetyCrewPerSquareCents": 3500,
    "guttersPerLinearFtCents": 900,
    "skylightEachCents": 65000
  },
  "addOns": {
    "iceWaterPerSquareCents": 7500,
    "ridgeVentPerLinearFtCents": 800
  },
  "urgencyBps": {
    "standard": 0,
    "priority": 1000,
    "emergency": 2500
  },
  "permitFeeCents": 15000,
  "minimumJobCents": 250000,
  "marginTargetBps": 3000,
  "marginFloorBps": 2000,
  "policies": {
    "maxLayersForOverlay": 1,
    "steepPitchRequiresSub": 10,
    "maxSquaresWithoutAdditionalSiteReview": 40
  },
  "takeoff": {
    "shingleBundlesPerSquare": 3,
    "underlaymentSquaresPerRoll": 4,
    "starterLinearFtPerBundle": 33,
    "ridgeCapLinearFtPerBundle": 33,
    "dripEdgeStickFt": 10,
    "iceWaterSquaresPerRoll": 2,
    "nailsSquaresPerBox": 10,
    "ridgeVentSectionFt": 4
  }
}

Apply imported rules?

The file passed validation. Review the changes against the active rules, then confirm.